Help

1-PPR TYPE

Create a PPR pipe type pipe and create a new Segment. Create your own fittings.

PPR pipe type uses own diameters.

Used only in the metric system.

In order to create the PPR pipe type, the standard pipe type must be loaded in the active document. Duplicates the fittings of the standard pipe type.


2-BLACKIRON PIPE TYPE

Create a BlackIron pipe type pipe and create a new Segment.

In order to create the BlackIron pipe type, the Chilled Water pipe type must be loaded in the active document.

Uses threaded fittings up to 2 "pipe diameter,  welded fittings for diameters greater than 2"

It takes the welded fittings from Chilled Water pipe type.

It loads the threaded fittings from the families in its own folder.


3-PIPE CLAMP

It only draws clamps on horizontal pipes.

To draw the clamps you need to select a pipe at the level you want to draw.

It only draws on the selected level.

Clamp spacing is 3m.

It is drawn on the rods with the clamp. If there is a floor above the pipes, the rods extend to this floor.


4-SCHEDULE PIPE CLAMP

Pipe clamps prepares list according to active view and the model.

Only for clamps created with pipe clamp command.

After the command runs, check the schedule list.


5-SCHEDULE PIPE BY PIPE SYSTEM

Whichever pipe you choose , it prepares the pipes on the same floor and in the same pipe system as schedule.

After the command runs, check the schedule list.


6-SCHEDULE PIPE BY PIPE TYPE

Whichever pipe you choose , it prepares the pipes on the same floor and in the same pipe type as schedule.

After the command runs, check the schedule list.

When you see the message below ,please press the delete button and continue.

"The duct/pipe has been modified to be in the opposite direction causing the connections to be invalid."


7-DUCT HANGER

The console draws only the horizontal and rectangular air ducts.

To draw the console, you need to select an air duct on the floor where you want to draw the console. It only draws on the selected floor.

Console spacing is 1.5m.

If there is a floor above the air duct, the rods extend to this floor.


8-CABLETRAY HANGER

The console draws  only the horizontal cable trays.

To draw the console, you need to select a cable tray on the floor where you want to draw the console. It only draws on the selected floor.

Console spacing is 1.5m.

If there is a floor above the cable tray, the rods extend to this floor


9-CREATE SHEETS

Create sheets by taking sheet names in excel.

It only takes the names in the first column. Names must be written one under the other in the first column of the Excel sheet.

After the command runs, check the sheet list.


10-COUNT INSTANCES

It counts the family instances you select the same instance in the model.


11-CREATE UNIONS

Create Unions at 3m, 4m, 6m intervals on selected pipes in Active View.


12-FABRİCATION PARTS.

Command optimizes length and places hangers for fabrication straight parts.

Not used for optimized length parts.

Fabrication straight parts must be selected before running the command.


Fabrication Parts Applicable;

Metric;

DuctWork: 250PA,500PA,750PA,1000PA,1500PA,2500PA,Flue Duct-MultiShape

Piping : ABS, Carbon Press Fittings,Copper Brazed, Copper Press Fit 

Copper Soldered, Polybutylene Electro Fusion , Polypropylene Socket Fusion

Press FitXGrooved, ThreadedXGrooved, WeldedXPress Fit

WeldedXSocketed, WeldedXThreaded, No Hub, No Hub Below Ground 

PVC-C 40

Electrical :  Busway, Ladder, Wireway

Imperial;

DuctWork: +2in WG, +4in WG, -2in WG, -2in WG,Flue Duct-MultiShape

Piping : ABS, Copper Brazed, Copper Soldered, DWC PVC 40

Poly Pro Electro Fusion, Poly Pro Socket Fusion, DWV Soldered

SolderedXGrooved, ThreadedXGrooved, WeldedXSocketed

WeldedXSoldered, WeldedXThreaded, No Hub, Service Weight

Electrical :  Busway, Ladder Cable Tray, Cable Tray

                        



            

Comments